J.Mac Scaffolding

Ship Building returns to Teesside

ship building

J Mac Scaffolding was Employed as the Specialist Scaffolding Contractor by McDonald Offshore and Marine Limited to undertake the Erection and Dismantle of Independent Free Standing Scaffolding and Various specialist safety guardrails to allow for the Safe construction and painting of the New Vessel, the Scaffolding was built using System Scaffolding and was built on Teesside using local Labour and Sub contractors.

The Vessel named the Scallop Trawler Summer Rose was launched on the Tees on the 19th October 2017, the Vessel circa 140t is the first boat to be launched on the River Tees for over 10 years.

Read about it here…

https://www.gazettelive.co.uk/news/teesside-news/future-bright-ship-building-returns-12864990
https://www.linkedin.com/pulse/mobilising-launch-summer-rose-steve-macdonald/

 

 ship building

Leave a Reply

Your email address will not be published. Required fields are marked *


Notice: Undefined index: eucookie in /home/hp3-linc4-nfs1-x/295/1057295/user/htdocs/wp-content/themes/espresso-child/footer.php on line 72